ELITE MANUFACTURING GROUP

0%

HOW IT WORKS

Built to our spec.

Every journey starts the same way: one steel box, finished to the millimetre. Scroll to travel with it.

Across open water.

The least predictable leg of the journey, so we own it: the booking, the customs entry, the clearance, all handled while it sails.

Up the highway.

From the port to anywhere Australia's roads reach. Stations, islands and mine sites included.

Onto your block.

Craned onto footings poured while it was at sea. One journey, one accountable company, typically 4-6 months, order to keys.

THE WHOLE JOURNEY, HONESTLY TOLD

Order to move-in, typically 4-6 months.

Most container-building websites promise a delivery date. We'd rather explain the journey and give you a range we actually hit, because the one thing that ruins this experience is a date that moves. Here is what really happens, stage by stage.

Every leg of the journey.

One container, one accountable company. Scroll to travel with it.

WEEK 0

01 · Order locked

Layout, fit-out and compliance agreed: the spec the whole journey follows.

TYPICALLY 8-12 WEEKS

02 · Factory build

Built to our specification by our manufacturing partners, inspected before it ships.

TYPICALLY 4-8 WEEKS

03 · At sea

The least predictable leg, which is why we own it, and why our dates are ranges.

CLEARED WHILE IT SAILS

04 · Port & customs

Documents forwarded, clearance paid, delivery order issued, ready before the ship berths.

AUSTRALIA-WIDE

05 · The highway

Trucked from the port to your block. Stations, islands and mine sites included.

SEQUENCED IN ADVANCE

06 · Your site

Craned onto footings poured while it was at sea; services connected.

TYPICALLY 4-6 MONTHS ALL UP

07 · Handover

Walk-through, keys, warranty. And the portal tracked every leg above, live.

The detail, stage by stage.

01

Specification & order

We lock the layout, fit-out, electrical spec and compliance path before anything is built. You see drawings of what you're getting, including our standard threshold-free access and sunken shower bases, and the factory builds to that spec, not to an interpretation of an email.

02

Factory build

Your building is constructed by one of the two established factories we work with, to our specification. We are not the factory, and that honesty matters, because what you are buying from us is everything the factory can't do: getting a finished building certified, shipped and standing on your block.

03

Shipping & customs

We book the sailing, run the customs entry and quarantine, and manage the port handling. Ocean freight is the least predictable stage of the journey, which is exactly why we own it rather than leaving it to you, and why our public lead time is honest about the range.

04

Site works

While your building is at sea, your site gets ready: footings engineered for your soil and wind region, septic and wastewater if you need it, power, water and site access. One crew, one plan, sequenced so nothing waits on anything.

05

Delivery & installation

Trucking, crane lift, placement, connection and commissioning. A 40-foot container on a truck needs real access, so we assess that before you order, not on delivery morning.

06

Handover

Walk-through, keys, documents, and warranty support after you move in. You can watch every stage above happen live in the customer portal from the day you order.

One contractor, the whole job.

A building you can't switch a light on in isn't finished. These are the works we deliver alongside the building itself.

Site preparation

Clearing, levelling and pad work before delivery day.

Footings

Engineered footings matched to your soil and cyclone region.

Delivery & set-up

Trucking, crane lift and placement, including remote access planning.

Septic & wastewater

Treatment plant supply and installation, council-compliant.

Plumbing & hot water

Connection to services, hot water system supplied and fitted.

Electrical connection

Mains or generator connection by licensed electricians.

Water tank & pump

Rainwater storage and pressure systems for off-grid blocks.

Air conditioning

Split systems sized for the harshest Australian heat, installed and tested.

Decking & roofing

Verandahs, walkways and roof-overs that turn a unit into a homestead.

Sealing & finishing

The last 2%: flashings, sealing, snag list, handover clean.

Want a timeline for your build?

Build & price ↗